Brent Heath
- City Staff2021
- Other capacity2017–2025
Where they show up
8 meetings
Each line jumps to the exact item — transcript pulls open with the name highlighted; agenda mentions pin the row.
- Tue, Jun 3, 2025Work SessionJun 03, 2025 Work Session
- Spokenpresenter
South Gateway Inundation Park Project Presentation
“Brent Heath with Shroud Engineering. We have been working with the city on this project from the inception.”
- Spoken
South Gateway Inundation Park Project Presentation
“Brent Heath with Shroud Engineering. We have been working with the city on this project from the inception.”
- Tue, Nov 19, 2024City CouncilNov 19, 2024 City Council
- Spokenpresenter
Approval of 2023 Utility System Master Plan Update
“My name is Brent Heath, I'm principal Stroud engineering and pleased to be here to present the utility master plan update.”
- Spoken
Approval of 2023 Utility System Master Plan Update
“My name is Brent Heath, I'm principal Stroud engineering and pleased to be here to present the utility master plan update.”
- Tue, Nov 1, 2022City CouncilNov 01, 2022 City Council
- Spokenpresenter
Presentation by Stroud Engineering Consultants, Inc. RE: River Road Neighborhood Improvements Preliminary Drawings
“I'm Brent Heath, principal of Stroud Engineering.”
- Spoken
Presentation by Stroud Engineering Consultants, Inc. RE: River Road Neighborhood Improvements Preliminary Drawings
“I'm Brent Heath, principal of Stroud Engineering.”
- Tue, Apr 19, 2022City CouncilApr 19, 2022 City Council
- Spokenpresenter
2022 WWTP Surface Water Discharge Administrative Order Compliance Task Order No. 14 - Engineering Services
“my name is Brent Heath. I'm principal of Stroud Engineering”
- Spoken
2022 WWTP Surface Water Discharge Administrative Order Compliance Task Order No. 14 - Engineering Services
“my name is Brent Heath. I'm principal of Stroud Engineering”
- Tue, Nov 16, 2021City CouncilNov 16, 2021 City Council
- Spokenpresenter
Request to Approve Florida Resiliency Coastline Grant Program Match
“this basin does not have any stormwater control other than just conveyance, and what's happening is that when you do have a storm event, all water goes directly to the river.”
- Spoken
Request to Approve Florida Resiliency Coastline Grant Program Match
“this basin does not have any stormwater control other than just conveyance, and what's happening is that when you do have a storm event, all water goes directly to the river.”
- Tue, Oct 6, 2020City CouncilOct 06, 2020 City Council
- Tue, Jun 4, 2019City CouncilJun 04, 2019 City Council
- Spokenpresenter
Task Order No. 36 Engineering Services – Consideration for Approval
- Spoken
Task Order No. 36 Engineering Services – Consideration for Approval
- Spokenother
WWTP Temporary Influent Pipe Installation – Consideration for Approval
- Spoken
WWTP Temporary Influent Pipe Installation – Consideration for Approval
- Tue, Jun 20, 2017City CouncilJun 20, 2017 City Council
- Spokenpresenter
Seawall Condition Assessment Report – Consideration for Approval
“My name's Brent Heath. I'm Principal of Trout Engineering, and I'm here to basically provide you with a summary and discussion of the results and our recommendations of the report.”
- Spoken
Seawall Condition Assessment Report – Consideration for Approval
“My name's Brent Heath. I'm Principal of Trout Engineering, and I'm here to basically provide you with a summary and discussion of the results and our recommendations of the report.”