Staff walked council through the proposed FY22-23 five-year Capital Improvement Program, including Recreation and Aquatic Center upgrades and stormwater, water and sewer projects.
4 items on the agenda
On the agenda
- 1Call to Order - Roll Call▶ 0:00
- 2
You arrived here from a search for “Grand Boulevard Park Improvements” — transcript expanded below
Review of the FY22-23 Proposed Capital Improvement Program
discussedStaff presented the FY22-23 Proposed Five-Year Capital Improvement Program, walking through projects funded by the General Fund, Stormwater Utility, Capital Improvement, and Water and Sewer Construction funds. Projects discussed include Recreation/Aquatic Center improvements, pool resurfacing, Beach Street stormwater, Fire Station 2 reconstruction, Grand Boulevard bridge replacement and multiuse path, Sims Park boat ramp improvements, Meadows Dog Park, HVAC replacement at City Hall, and the fleet/warehouse replacement, among others. The work session was for review and discussion; no formal action was taken.
Beach StreetCarlton Road-Dartmouth area, North River neighborhoodEnd of Congress StreetGrand BoulevardHigh Street and Tanglewood TerraceLittle Road and Massachusetts AvenueMaple Street and High StreetNorth of Cecilia, east of Madison StreetNortheast corner of Main Street and River RoadMPOPasco CountySWFWMD (Southwest Florida Water Management District)Crystal Feast2024 Resiliency ImprovementAmerican Rescue Plan Act fundsBeach Street Stormwater ProjectCapital Improvement FundCity Hall HVAC ReplacementCity Hall Restroom RenovationCommunity Redevelopment FundFY 2022-2023 through 2026-2027 Five-Year CIPFY22-23 Capital Improvement ProgramFire Station 2 ConstructionFleet and Purchasing Warehouse ReplacementGeneral FundGrade Preserve Improvements Phase OneGrand Boulevard Bridge ReplacementGrand Boulevard Multiuse PathGrand Boulevard Park ImprovementsMeadows Dog ParkNewport Richey/Pasco County Interconnect UpgradesNorth River Drainage ImprovementsOrange Lake cleanupPenny for PascoPool Resurfacing ProjectRecreation and Aquatic Center ImprovementsSewer and Water Construction FundShade Canopy ReplacementsSims Park Boat Ramp ImprovementsSims Park North Multiuse Path Feasibility StudyStormwater Utility Assessment ($80 per ERU)Stormwater Utility FundStreet Improvement FundVulnerability Study▶ Jump to 0:14 in the videoShow transcriptHide transcript
Auto-transcript · machine-generated, may contain errors
[00:00:15] review of the 22-23 proposed capital improvement program. It's our pleasure to present to you [00:00:22] our five-year capital improvement project budget. The goal is to complete projects which [00:00:35] meet three priorities. One, secure the city's assets and promulgate appropriate design and [00:00:43] maintenance standards, and of course, mobilize reinvestment. There are six funding sources [00:00:51] that the city relies on to fund capital improvement projects. They are the General Fund, the Community [00:01:01] Redevelopment Fund, the Capital Improvement Fund, the Street Improvement Fund, the Sewer [00:01:12] and Water Construction Fund, and the Stormwater Utility Fund. The city also uses a myriad [00:01:20] of grant funds as they become available from state and federal sources to leverage our [00:01:29] funding sources so that we can implement more projects than we can with the funding that [00:01:42] we have available through our own funding sources. The projects, as they're put forward [00:01:50] to you in the program that has been transmitted to you, are organized in a fashion so that [00:02:01] in each category, you have a presentation page which contains a funding summary for the projects [00:02:12] in that funding category, and then it's followed by a narrative which provides a description [00:02:21] of each individual project. You'll find that the projects that we have proposed for inclusion [00:02:31] in this year's capital improvement project budget were selected to coincide with your [00:02:40] ongoing goals and initiatives as stated in your strategic plan. With that, I'd like to [00:02:48] turn it over to the Finance Director and the Public Works Director for a formal presentation [00:02:55] of our budget for the 2022-2023 through 2026-2027 Capital Improvement Program. [00:03:10] Just to add to this a little bit, what we ended up doing was we did our descriptions [00:03:16] on the PowerPoint for the projects that are going to be proposed during this coming year. [00:03:24] You'll notice in your packet you have the spreadsheets that are here. So what you can [00:03:31] do, and the reason why we flip-flopped it, was we'll go ahead and go through the projects [00:03:38] at the description pages, the ones that we're going to be doing this year. You all can take [00:03:42] a look at these spreadsheets and see them here, and then at the end of each category [00:03:49] we will show that same spreadsheet that you're looking at, and we can discuss all the projects [00:03:57] that are within the five years that don't have any description pages. Then Crystal Feast, [00:04:04] the Finance Director, will answer any questions. You'll see that there is a summary of funding [00:04:08] on those spreadsheets. She'll go ahead and answer any of those questions that you may [00:04:13] have with those. So to start, our first division is the General Fund Project. [00:04:21] Which is page 8 of your agenda packet. [00:04:30] So the first project that we're proposing in this year is the Recreation and Aquatic [00:04:35] Center Improvements. This consists of restroom renovations, the painting of the gym walls [00:04:42] where needed, and the replacement of the existing divider wall between the two courts. This [00:04:50] project is proposed to begin this year and be completed prior to the year's end. And [00:04:58] we have a penny for PASCO tax dollars at $490,000. [00:05:06] The next project is the pool resurfacing. The Aquatic Center has four pools. They are [00:05:13] all 14 years old. The recommended industry standard is between 8 and 12 years for them [00:05:19] to be resurfaced. They are in pretty bad shape, so we're proposing to resurface the activity [00:05:26] pool and the plunge pool this year. And we have $100,000 for this year and then $120,000 [00:05:33] for next year. [00:05:38] The next one, actually the final proposed project that we have is the shade canopy replacements. [00:05:46] Same type of characteristics as far as they're 10 years plus, have served their useful life. [00:05:53] So we have budgeted $45,000 for the replacement of the shade structures that are around the [00:06:00] pool area and the eating area and where some of the people will sit and stuff like that. [00:06:07] And so this is the spreadsheet that I was talking about. And you'll notice, like when [00:06:13] I described the pool resurfacing project at $100,000 for the first two pools, you'll see [00:06:20] over in the 23-24 where we have $120,000 and that's the continuation of that project [00:06:26] until they're completed. [00:06:33] On the pool resurfacing, so the two, the activity pool and the plunge pool, $100,000 for this [00:06:40] upcoming year and then the following year, you'll do the lap and the dive pool? [00:06:47] Yes, sir. [00:06:50] All right, and the funding sources for these projects that we presented, we're proposing [00:06:58] that they come from Penny for Pasco funding. All of the projects fall within the categories [00:07:05] that City Council has approved for Penny for Pasco spending, and they are considered [00:07:10] eligible projects. So we're proposing that they are funded by Penny for Pasco. [00:07:17] All right, the next fund is stormwater utility fund, and you'll find the summary of that [00:07:26] on page 12 of your packet. [00:07:33] So this project is one, it's a repetitive project that we typically have $100,000 budgeted, [00:07:40] and this is in all reality a reactive type of project that we propose. During the storm [00:07:49] year we might have some major flooding in some areas, maybe an existing berm that we [00:07:56] may have might erode and open up. We need to get a contractor in there. These funds [00:08:01] are used for that, and when they are utilized, we come before you to ask for approval. So [00:08:07] we have $100,000. [00:08:11] The next project that we have is the Beach Street stormwater. This project begins at [00:08:16] Maple Street and High Street. That's just north of the high school. That has a repetitive [00:08:22] flooding area, and it heads north on Beach Street and heads out to an outfall that's [00:08:31] there by the river at the top of the screen. The project includes approximately 2,000 feet [00:08:39] of 36-inch storm pipe, and then there is a water quality element that's proposed to be [00:08:45] installed. That's a CDS unit that would treat any debris that might get in the system prior [00:08:50] to it going out into the river. [00:08:53] We have, the project itself is approximately $1.2 million. We're proposing to start this [00:09:00] project during the year, and it will overlap into the 23-24. Currently, we do have SWFMUD [00:09:08] funding at $354,000. That's cooperative funding. We are applying for a federal grant of $872,000. [00:09:21] That's part of the resiliency, some of the federal funds that are coming down the pike, [00:09:26] so we would utilize both types of grant funding for the project. [00:09:31] With that, we're at the spreadsheet. You'll see that we have proposed the North River [00:09:42] drainage improvements. That's the Carlton Road-Dartmouth area in the North River neighborhood. [00:09:48] That's where there currently is no drainage systems, so that'll get a system installed [00:09:55] there. Then the 2024 resiliency improvement, that's that proposed grant funding that we [00:10:03] ended up getting for the retention structure over on the west side of the bridge. [00:10:12] These stormwater projects are being proposed to be funded by our stormwater utility assessment [00:10:19] fees. It's an annual assessment that we charge or assess our residents. Right now, on average, [00:10:28] each parcel, particularly our residents, get charged $80 per ERU. In total for the upcoming [00:10:38] fiscal year, we are estimating a little over $1 million, so $1,050,000 of assessment fees [00:10:47] that we'll use to not only fund these capital projects, but also the personnel and other [00:10:53] operating expenses of the stormwater utility fund. [00:10:57] At downtown resiliency, that's where we were talking about, south of the parking structure? [00:11:08] Correct. [00:11:09] We were talking about a couple grants there. You had a $300,000 grant for SWFMA and applying for a federal grant of $800,000. [00:11:22] If we were successful in that, what's the calendar date for the $800,000 grant? [00:11:29] We are going to perform a vulnerability study that we need to have as part of that grant, and we're [00:11:39] actually going to have that as an item on the council agenda. We would propose that [00:11:44] the consultants say that it would take anywhere between three months to get that completed. [00:11:51] We're in the middle of that portion right now, so I would think that we would be, halfway [00:11:57] through the year, we would know if we got the money or not. [00:12:00] I'm just thinking out loud. I know you've figured this out a little bit differently, [00:12:05] but we're looking like we've got $1.2 million for this Beach Street stormwater improvements, [00:12:13] and between those two grants, that would almost take care of that. [00:12:19] Correct, but the thing that we don't know is SWFMUD. We ended up having a SWFMUD grant [00:12:30] when we did Orange Lake cleanup, and we ended up getting some restore money for that. SWFMUD [00:12:38] came back and said, hey, we're going to count that against the contribution portion, so [00:12:46] they deducted some of their grant. We don't know if that will happen or not. It possibly [00:12:52] could, and you could end up being right at the $1.2. [00:12:57] If I may add, both of these grants, whichever one we do receive, are on a reimbursement [00:13:04] basis, so we do have to spend the money first and then apply for reimbursement. If you look [00:13:09] at the summary of funding down at the bottom, you'll see that there's a line for grants, [00:13:16] and in fiscal year 23-24, we have money budgeted, the $872,000. That is the federal grant that [00:13:25] we're expecting to receive. You'll see I've budgeted those revenues coming in on the next [00:13:29] fiscal year instead of up front for next year. [00:13:35] Okay, so the next fund is our capital improvement fund, and that starts on page 16. [00:13:52] This project is the grade preserve improvements phase one. We're calling out for the completion [00:13:59] of the design phase for this coming year. This is actually a piece of property that [00:14:06] the city acquired at the end of Congress Street. Once we complete the improvements here, we'll [00:14:14] have an entrance to the grade preserve from the city limits. Of course, this would include [00:14:20] the construction of a new shell parking lot, restroom construction, landscape, hardscape. [00:14:27] It would include an extension of the trail, a pedestrian overpass bridge that would get [00:14:37] us over into the grade preserve, and then we would connect to the existing trails. The [00:14:44] construction is scheduled for 23-24 and 24-25. [00:14:51] This is the Meadows Dog Park. We are proposing to... [00:15:00] to construct this project, and it would be completed prior to the 23-24 year. [00:15:09] The park itself is located in the meadows. It's north of Cecilia and east of Madison [00:15:16] Street. The upgrades include the removal and replacement of the existing playground, the [00:15:23] playground surface, the renovation of the existing restroom, improvements of the trail [00:15:31] path areas, as well as the dog areas that are existing there. Construction costs are [00:15:41] estimated at $900,000. [00:15:45] This is the Grand Boulevard park improvements. The installation of shade structure over the [00:15:54] playground area is called out, as well as the removal of the existing mulch with the [00:16:01] mat similar to Sims Park. Lighting improvements to the park, as well as refurbishing the [00:16:10] parking lot with shell. And we've got that, and removal, I don't know if I said it or not, [00:16:16] but the playground equipment itself. And so we're looking at $180,000 for construction. [00:16:25] You're familiar with this project. This is the Fire Station 2 construction project. This [00:16:32] replaces the existing station on High Street and Tanglewood Terrace. It includes a two-bay [00:16:39] drive-through structure, separated hot zone area, state-of-the-art safety features, and [00:16:46] up-to-date living quarters. We're looking at an estimate of approximately $3.5 million. [00:16:53] Bond proceeds from the American Rescue Act are expected to pay for this project. [00:17:02] We came to you earlier this year on this project. This is the HVAC replacement at City Hall. [00:17:09] This includes a replacement of the 76-inch ton chiller, as well as air handlers 1, 2, and 3. [00:17:16] We direct purchased all the material, and hopefully this project will get started in November, [00:17:23] and we've got $400,000 budgeted for the construction. [00:17:27] The next one is the 23 Sims Park boat ramp improvements. You're familiar with this one. [00:17:34] This includes, well, first of all, the location is just northeast corner of the Main Street and [00:17:42] River Road is where we're at. It's calling for expansion of the area itself, parking lot [00:17:52] improvements, the removal of the existing restroom and the construction of a larger one, the [00:17:59] construction of sidewalks around the boat ramp, seawalls connecting to the shelters and capping of [00:18:06] the existing seawall be included. This is going to occur over several years, as you can see. [00:18:15] We have, hopefully, the assemblage occurring this year. We have that at $500,000, and then we have [00:18:23] design for 23-24, and then it'll take us approximately three years for the construction to conclude. [00:18:32] This is a reoccurring project that we have. This one element calls for the renovation of the [00:18:40] existing restrooms located on the second floor here at City Hall, and we have approximately [00:18:47] $220,000 budgeted for those upgrades. [00:18:55] Grand Boulevard bridge replacement, that is a project that the city and the county will execute [00:19:03] in a local agreement and work together on. The bridge is, we're proposing to hopefully be able to [00:19:09] elevate it approximately five feet or the same height as the Main Street bridge. We have utilities [00:19:15] on both sides of the existing bridge now that will have to be temporarily replaced. [00:19:22] That will have to be temporarily put in place and then installed on the new bridge. [00:19:28] It also will include the multi-use path design on the top side of the bridge, as well as some [00:19:36] right-of-way improvements that need to be performed. [00:19:40] Good question. When you say you're hoping to be able to raise it, there'd be some issues with that? [00:19:49] There's no issues that we are aware of. We've done a pretty good job. [00:19:56] We're hoping. What are we hoping? What's going on? [00:19:58] There are design challenges without question that need to be addressed, but the county hasn't initiated [00:20:05] the design process, so we're not certain at this point what will need to be done in order to make sure [00:20:14] that the existing properties on Grand Boulevard will have ingress and proper egress from their properties. [00:20:22] We've ended up getting grade shots of the existing conditions, the proposed height increases, [00:20:28] and it looks like we're going to get it, no problem, but until we really get to that next stage of engineering, [00:20:37] I don't want to present to you and say, oh, definitely, it's going to be five feet. It might be four and a half. [00:20:43] It should be five, but we're not there yet. [00:20:49] Do we have a timetable on the county's timetable when they're going to go to engineering on this? [00:20:54] Well, they just ended up getting the RFQs in, and so we ended up reaching out to them. [00:21:02] They are going to start holding those meetings over the next month, [00:21:10] and so we would expect that they would be taking it to their board for the consultant selection by September, [00:21:19] and I would think that their design would start in October. We're expecting them to. [00:21:30] This next project that we have is actually a feasibility study. [00:21:34] Typically, we don't put studies in a capital improvement program, [00:21:37] but we did here because this one could result into going into engineering and construction, [00:21:43] depending on the feasibility results that are submitted to you all. [00:21:49] This is basically talking about a multiuse path that would be on the north side of Sims Park [00:21:57] that would get us out to the New Port Richey city limits. [00:22:02] We've had those discussions, and so basically we need to start off with a feasibility study [00:22:07] that analyzes the existing conditions, takes public input of the residents that are there, [00:22:14] as well as other residents that might want to utilize or not utilize it, and then go from there. [00:22:20] And so that's $50,000 that is budgeted. [00:22:27] This project here we are all familiar with. It's the Grand Boulevard multiuse path, [00:22:33] and so this calls for the construction and design of the area from Marine Parkway along Grand Boulevard north [00:22:41] up to the bridge at this point, and we would expect that as we are performing this, [00:22:48] we would also be coming to you with proposed engineering task order to complete north from the bridge [00:22:57] all the way to Delaware at this point. [00:23:00] And we have $1.4 million that is budgeted with an engineering of $150,000. [00:23:08] There is potential. [00:23:10] We have another item that we are bringing to you today at the next meeting that is talking about another analysis [00:23:19] that we need to perform to be able to get grant funding. [00:23:23] The grant funding is for regional projects. [00:23:26] We're trying to work with the MPO to be able to get funding for the construction of this project. [00:23:41] All right, so the funding for these presented projects will primarily come from Penny for Pasco funds, [00:23:50] and then also some possible grant funds that our staff has worked on to get. [00:23:59] In addition, we have some prior year rollover of funds in this particular fund that will cover some of the projects [00:24:08] that were presented as well. [00:24:13] A question about Mike. [00:24:15] If we can go back to the Fire Station 2, just a couple of questions. [00:24:22] I know that we have a funding source, both bond proceeds and American Rescue Plan funds. [00:24:31] That's a major project. [00:24:33] I don't know how those – two questions I really have. [00:24:38] Number one, I know that we went out to bid on that project, I believe, last year, [00:24:45] and we're not real happy with what we received based upon some inflationary cost runs, [00:24:52] and maybe we're going to re-look at that design to see if there can be modifications to be changed or not. [00:25:00] And then secondly, so the question is where we are on that versus what our initial budget was [00:25:08] versus what our projected cost bids came in. [00:25:14] And then did we make adjusts? [00:25:17] I don't recall this budget here for construction of 3.5. [00:25:22] I don't know if that changed. [00:25:23] I don't recall what it was before. [00:25:26] And then what's the breakdown on the Rescue Plan funds and our bond proceeds on that project? [00:25:37] Do you have any – [00:25:38] Talk about the construction side. [00:25:40] I'll kick it off, if that's all right. [00:25:44] At the conclusion of the review of bids last year, at the suggestion of Mr. Rivera, [00:25:54] we sat down with the contractors that had submitted the three lowest bids, [00:26:02] and we conducted interviews with them and learned from them the basis of their bids [00:26:11] and what we could have done differently that would have made a difference in the bids. [00:26:17] And we learned some very good, very important information from them on some design changes [00:26:24] that we could make that would have been impactful to our budget. [00:26:30] And as a follow-up to that, they also said some things that the market was just at a place [00:26:42] and there were supply chain issues that just made it a really bad time for us to bid the project. [00:26:51] And they encouraged us to wait until we re-bid the project. [00:26:57] We've heard some things recently from some contractors that it might be time, [00:27:04] there might be some loosening in respect to some of the supply costs that we largely depended on, [00:27:17] like metals, for this specific project. [00:27:23] I've had some recent conversation with the architect, [00:27:29] and we want to make some changes in the building that would be more in line [00:27:36] with some of the recommendations that we received from the contractors that bid the project [00:27:42] to see if we might be more in line with the budget we have. [00:27:49] The budget we have is more than what we originally projected. [00:27:53] I think we were at 2.9 originally, if I remember correctly. [00:27:58] And we put additional American rescue funds in the budget to reflect the fact that the market isn't the same today [00:28:08] as it was when we originally designed the project and established an estimate of probable construction costs. [00:28:20] And that's why we established money in our American care funds to cover overages in construction [00:28:33] as a result of COVID-related factors. [00:28:39] So now we're at 3.5, and we're hopeful that the project would come in near that money [00:28:47] with some minor design changes and a better bidding climate. [00:28:54] Is there something that I need to add or that you'd like to add? [00:28:59] The bond at that time, were we thinking of a $2.5 million bond? [00:29:04] We actually bid more than that for the bond because we actually rolled in the library project [00:29:10] as part of the bond at the same time. [00:29:14] I just had to inquire a little bit because I knew that's a major project, and I just wanted to get the update. [00:29:29] So I appreciate that insight. [00:29:31] It is a major project. [00:29:34] And as a council, we haven't really contemplated yet, and it's sort of in the back of my mind [00:29:44] as the backup plan what we're going to do with the property that they're vacating. [00:30:00] that is an opportunity for some redevelopment, which may yield some additional revenue which [00:30:07] could be brought into the project if we chose to do so. [00:30:15] So the next fund that we will cover is the Water and Sewer Construction Fund, which starts [00:30:21] on page 31. [00:30:25] And so these first set of projects that you see, those are what we call reactive projects [00:30:29] as well. [00:30:30] An example would be if somebody has an existing septic system and they have a failure and [00:30:37] they could be 100 feet from us, we would use one of these projects to be able to go ahead [00:30:42] and fund it to where we could make or expand our system and make it available to them. [00:30:51] This project here is similar to the fire station when we went out to bid. [00:30:56] This is replacing the existing fleet and purchasing warehouse that we have. [00:31:01] It was constructed in 1973. [00:31:04] And so we have proposed to start construction this year and we budgeted $2.2 million and [00:31:15] then it would go into the 2023-2024 year and we would have another $2 million. [00:31:27] This project is the New Port Richey and Pascoe County interconnect upgrades. [00:31:32] This is actually our connection point to Pascoe County in case of an emergency. [00:31:37] It's off of Little Road and Massachusetts Avenue. [00:31:41] It was constructed in the 1970s and as you can tell it's served its useful life. [00:31:49] And so we've got $400,000 approximately for construction budgeted for this project. [00:31:58] This is the advanced meter infrastructure system. [00:32:03] Currently, we completed phase one that replaced our existing old type of dial register meters. [00:32:14] We've upgraded since then to the AMI or smart meters. [00:32:18] We've got approximately 7,500 of them still in the ground. [00:32:23] This project is budgeted for having a contractor come on board and actually replace those meters [00:32:30] out. [00:32:31] We came to you all a few months back and asked to get the funding to be able to purchase [00:32:38] those meters directly. [00:32:40] And so this is just for the construction portion. [00:32:46] This is the 2021 water utility system improvement. [00:32:51] And as many of you know, we end up doing a construction phase of water improvements one [00:32:58] year and then sewer improvements the other year. [00:33:02] And in between that, we end up doing the design. [00:33:06] This here is the construction portion. [00:33:09] We have this divided up into two years as well. [00:33:14] This coming year as well as the next year. [00:33:17] And basically it is approximately 8,000 linear feet of 6 to 8 inch water main pipe replaced [00:33:26] as well as the different facilities that come with that as far as valves and fittings, [00:33:31] those types of things. [00:33:33] And then the location is the surrounding area of the downtown. [00:33:42] And so this is the sewer improvement. [00:33:45] This would be the engineering design phase while we're constructing the water phase, [00:33:50] we'd be designing sewer. [00:33:54] This actually calls out for the last of our two old lift stations that we have to be replaced. [00:34:02] And so that's huge for us. [00:34:05] And so then we also are going to be upsizing 8 inch force main that's associated with those [00:34:11] lift stations and that's budgeted at approximately a million. [00:34:17] The town and country project you're familiar with, that's the old Habitat for Humanity [00:34:23] over there, Southgate area, where they're constructing the new homes. [00:34:27] That system currently, or I'm sorry, there is no system there. [00:34:31] It is all septic except for where they built some of those homes now where we've been able [00:34:36] to supply them with sewer. [00:34:39] We will be working out an interlocal agreement with Pasco County. [00:34:44] That agreement calls out for the county to allocate $2 million towards this project. [00:34:52] I think our last bid that we had was $1.8 to $2 million. [00:34:57] So we're proposing to have 100% funding for this. [00:35:02] And it would include approximately 3,500 feet of new gravity sewer pipe as well as force [00:35:08] main to extend to 115 parcels. [00:35:17] And the funding for these projects will include, as Robert just mentioned, Pasco County Cooperative [00:35:25] Agreement bond proceeds from our 2019 issue. [00:35:31] That's the remaining portion of those bond proceeds and then a rollover of reserve funds [00:35:36] to cover the remaining portion. [00:35:43] And then the next fund we'll go over is the CRA fund and that begins on page 45. [00:35:51] And so the first project that we are proposing is the Main Street Gateway entrance sign. [00:36:04] Actually, it's basically two signs. [00:36:06] We have an electronic board similar to the ones that you see on Main Street that would [00:36:14] be installed on the southeast corner of Main Street and 19 and then approximately 100 feet, [00:36:23] 200 feet from the intersection on Main Street that also is east of US Highway 19. [00:36:31] We would have a sign that would extend all the way across Main Street that would acknowledge [00:36:39] the city of New Port Richey entranceway. [00:36:43] In addition, where you see that gap now in between the hedges, we would work with Kaiser [00:36:49] University to install what we would call a courtyard setting, improvements over on that. [00:36:57] That would be included in this project. [00:36:59] So we do have an estimate of $350,000 to be constructed for construction this coming [00:37:05] year and that also would include contributions from the city as well as Kaiser. [00:37:13] This is Railroad Square. [00:37:17] We had just talked about it in the previous meeting that we just had. [00:37:23] We've got American Rescue Act funding at a constructed cost of $2.9 million. [00:37:33] This is our streetscape enhancements. [00:37:37] We had this last year as well and it's, I believe, going to be, as we move down, it's [00:37:42] going to be one of those standard projects that we have. [00:37:47] We will end up including a master plan which identifies the different types of amenities [00:37:54] that we could have in the downtown areas as far as bike racks, banners, planters, shade [00:37:59] structures, all of those types of things that we would do year after year. [00:38:05] We've got $50,000 budgeted for this year in construction. [00:38:14] And the summary of funding for the projects we just proposed include tax increment financing, [00:38:21] American Rescue Plan Act funds, and a rollover of funds from this fiscal year that we expect [00:38:30] to not spend and so we'll rollover it into the upcoming fiscal year. [00:38:37] Just a couple of things, go back just one, the streetscape enhancement there, I'm just [00:38:49] trying to wrap my head around it, we used $25,000 worth of engineering to do $50,000 [00:38:53] worth of construction. [00:38:54] And I realize some of that engineering might go into future years, but we also have a pretty [00:39:00] good tide of money for engineering in the future years. [00:39:03] I'm just trying to wrap my head around it, we used $125,000, I'm just trying to understand [00:39:13] engineering expense. [00:39:15] Engineering expense in this, this year you would be talking about a master plan that [00:39:18] would identify existing conditions and the proposed elements that you're going to be [00:39:22] included. [00:39:23] If the following year you all say, okay, we want to put some additional shade structures [00:39:29] in, then you have to supply engineers a set of drawings to get permits to construct those. [00:39:37] So you might have engineering in one year, if we sit there and elect to do like we did [00:39:45] last year where we had trash cans that we were replacing, that you didn't need any engineering [00:39:52] then that fund would rollover. [00:39:56] It might not support, if you'll allow me, the engineering might not support the construction [00:40:04] necessarily, it might be related to another project. [00:40:10] So we might be engineering for something that's going to happen in a future year, so it might [00:40:16] be a portion of the total cost for engineering where we might just use the construction cost [00:40:25] for trash cans or benches or planters where we really don't need any engineering funding. [00:40:34] But if we were putting up shade structures in the downtown, then we would need engineering [00:40:40] money and we might plan for that over a couple of years. [00:40:47] It looks funny though. [00:40:48] Specifically the engineering, current year and future years, the summation, the engineering [00:40:55] still runs 20% or 25% of the entire project cost, it's just... [00:41:03] It does seem funny. [00:41:05] The 20% is, we're starting to see engineering services up there, minimum 15%, they're hanging [00:41:14] around 15, 18. [00:41:17] So I think it's a sign of things to come. [00:41:20] We're more busy with projects now. [00:41:24] We're getting a deal with Square, $25,000 engineering, $3 million construction, so. [00:41:32] Everything's different. [00:41:33] I just... [00:41:34] Well we've done... [00:41:35] We've probably done some engineering work before. [00:41:36] We've done engineering with a couple of task orders, this is what's left. [00:41:43] Back in 14, we used to be able to beat them up, maybe get them to 9%, between 11%. [00:41:49] But it has consistently been going up since that time, as Robert's indicating. [00:41:56] Well I just have two, I'll also just point out, the Town and Country Leisure Lane, that [00:42:02] area, we've talked about that for a number of years, that little enclave, so to speak, [00:42:09] that needs to be attended to. [00:42:14] So I'm pleased to see that the county's stepping up and offering the $2 million to help that [00:42:21] situation. [00:42:22] So, a long way in allowing more options for that property in the future. [00:42:31] So it's just happy to see that come to fruition. [00:42:38] It's been great to work with on the project. [00:42:42] Alright, so the final fund that we will cover is the Street Improvement Fund, and that begins [00:42:49] on page 51. [00:42:52] So this is your traffic signs upgrade. [00:42:58] Right now we are... [00:42:59] Mr. Mayor, can you hear me? [00:43:00] Yes. [00:43:01] Go ahead. [00:43:02] I'm sorry. [00:43:04] Can you let me slide in just a few comments on the CRA budget? [00:43:11] Sure. [00:43:12] Yeah. [00:43:13] The $2.9 million for the railroad square to come from the American Rescue Act, which would [00:43:26] be helpful, I think, for me to see, again, how that money is going to be distributed [00:43:35] versus the resolution that was before us a year ago. [00:43:42] But when it compares to the $50,000 to provide shade and lighting, which we paid, you know, [00:43:51] speaking of engineering fees, we paid a considerable amount of money to consultants and got some [00:43:57] great strategy to help the economic development of our city through facade design, shade structuring, [00:44:11] lighting, and other sort of safety measures. [00:44:17] I just question the intent of the American Rescue Act money to help and support economic [00:44:24] recovery and putting nearly $3 million in one block and spreading $50,000 among the [00:44:32] rest of the city. [00:44:33] I'm not so sure how well that goes over. [00:44:36] I do think it's an exciting project. [00:44:38] I can't wait to see it. [00:44:42] I feel that that $50,000 is probably shy of the mark, considering we're probably going [00:44:50] to have to receive both two years' batches of funds from that act. [00:45:00] And I think it might be worthwhile us revisiting that. [00:45:04] One other thing related to these boat ramp improvements, [00:45:12] also described in the report that we got [00:45:18] was allowing that facility to be a mixed-use facility. [00:45:25] And then we identified as boat ramp improvements, [00:45:27] and maybe the capital improvement page [00:45:34] reflects those capital improvements related to that. [00:45:37] But I think we are either ignoring or missing the mark [00:45:41] by not citing the fact that the CRA has plans [00:45:47] to participate in that assemblage of properties [00:45:50] that it's been putting together for more [00:45:55] than just recreational and public purpose, [00:46:01] but to create increment, which is [00:46:03] the whole goal of the elimination of slum and blight [00:46:06] and to get property values on the tax roll. [00:46:12] So thank you for letting me speak. [00:46:13] It's hard to interact, so I'm going to stop and turn back [00:46:17] to the TV and listen. [00:46:19] All right. [00:46:20] Thank you for your comments, Pete. [00:46:26] Thank you. [00:46:29] The next funding is the Street Improvement Fund. [00:46:34] This project is traffic signs upgrades. [00:46:36] I'm sure you all have noticed where [00:46:38] we have in the downtown area where we've upgraded [00:46:41] the decorative signage. [00:46:44] This continues that. [00:46:47] We have $50,000 allocated for this year. [00:46:51] This is the 2122 Neighborhood Improvement Project. [00:46:55] This is the North River Road project [00:46:57] that we've all talked about. [00:47:00] We've got a construction estimate of $1.5 and $80,000 [00:47:04] in engineering. [00:47:06] This is for the upgrades from Main Street all the way [00:47:11] to Legion's Place. [00:47:13] It also improves both intersections [00:47:16] at Veterans and River Road, as well as Legion's Place [00:47:21] and Veterans. [00:47:22] It takes and replaces and relocates the existing sidewalk [00:47:27] on the east side and calls out for hardscape, landscape, [00:47:33] and lighting improvements to the area. [00:47:39] This is the LED crosswalk, the signage and lighting system [00:47:44] project that we have. [00:47:47] This year, we're expected to direct purchase and install [00:47:51] the systems at North River Road, at Green Key Road, Madison [00:47:56] Street at Kentucky, and then Grand Boulevard [00:47:59] at Missouri Avenue. [00:48:03] This project is the West Main Street sidewalk improvement. [00:48:08] This calls out for a five-foot sidewalk [00:48:10] to be installed along the road. [00:48:12] This is the roadwalk to be installed [00:48:14] along the north side of Main Street, [00:48:16] in between US-19 and Oldsner Road. [00:48:19] It also includes drainage improvements [00:48:22] to the existing drainage system that's out there, [00:48:26] right at the S-curb by Town Square Villas. [00:48:31] We'll be upsizing that and then installing [00:48:33] drainage swells along that. [00:48:36] Do you anticipate that's going to stop the street flooding [00:48:39] that happens every time it's potting? [00:48:42] I don't think that it would eliminate any flooding that's [00:48:45] on the west side. [00:48:46] Do I think that it will have an impact and reduce it? [00:48:51] Yes. [00:48:54] I've had conversation with the county [00:48:58] about them participating with us in the project, [00:49:02] and I expect that they'll be back with us soon. [00:49:05] Part of that, I think, may just be [00:49:07] that street is so doggone low compared to everything else. [00:49:10] It just pools there any time you get a decent storm. [00:49:14] And I think some of the problems that you have as well, [00:49:16] is like Town Square Villas, is almost at the same grade. [00:49:21] So if you lift the road, you're going [00:49:23] to flood Town Square Villas. [00:49:26] But as Ms. Manns was talking, we have reached out to the county [00:49:29] to let them know, hey, we're doing a project. [00:49:33] Would you be interested in constructing sidewalk [00:49:36] and drainage swells to the west of Oldsner Road that [00:49:40] goes out to see forest? [00:49:42] And we also are looking at some funding as well for the project. [00:49:50] This is our roadway and parking lot striping program. [00:49:53] We've got $35,000 allocated this year. [00:49:57] And we would be looking at, we did the recreation center [00:50:01] parking lot over by the tennis courts. [00:50:03] The rest of their parking lot area is in pretty bad shape. [00:50:06] So we would anticipate restriping those areas. [00:50:12] This is the neighborhood alley improvements. [00:50:15] This is a directive from city council to reclaim our alleys. [00:50:20] What we ended up wanting to do is [00:50:23] to start off by getting those alleys surveyed, [00:50:26] so that we can tell what our limits are. [00:50:29] A lot of the alleys now might be open. [00:50:32] But because of usage, they may have been naturally shifted over [00:50:38] by the people that use them. [00:50:40] We have found some alleys that were 20 feet off [00:50:43] of where they were. [00:50:44] So this year, we would hope that we [00:50:47] would be able to finish the survey work that we have [00:50:51] before we start getting in there and letting everybody know [00:50:55] that, hey, we're going to be reclaiming them. [00:50:58] This is the West Grand neighborhood sidewalk [00:51:02] improvement. [00:51:03] This is the project that you're familiar with. [00:51:05] We ended up getting grant funding for it. [00:51:08] This area is in the East Grand and West Grand neighborhoods. [00:51:13] It's approximately 14 linear feet, 1,000 feet [00:51:16] of sidewalk installation, where there [00:51:20] are areas that have gaps in between existing sidewalks. [00:51:26] And there are roads that basically [00:51:28] have no sidewalks at all. [00:51:31] And so this project should fill those gaps in. [00:51:36] We have a million dollars that's budgeted for the project. [00:51:39] And like I said, it should be 100% funded with the CDBG grant [00:51:43] funding. [00:51:44] That's going to be expanded eventually? [00:51:46] I noticed right at the bottom there, [00:51:48] before the river, like Riverview and Rio, [00:51:53] wasn't shown on there. [00:51:54] Correct. [00:51:55] There's none there now. [00:51:56] Correct. [00:51:56] We have a, I was talking with Councilman Peters earlier, [00:52:01] when we performed our pavement management plan, [00:52:03] we also did an analysis of the existing sidewalks, [00:52:07] their widths, their conditions, what side of the road [00:52:11] they were on, and started ranking of which ones we [00:52:15] would like to remediate first. [00:52:17] And the first ones, obviously, are the areas [00:52:21] that we have no sidewalk or that we have the gaps. [00:52:24] We still perform maintenance on the ones that are existing, [00:52:28] either through using our maintenance staff [00:52:31] or taking them when we perform our paving projects. [00:52:37] We will take care of any of the sidewalks that are broken up [00:52:41] and damaged at that time, too. [00:52:45] This project is the Madison Street sidewalk relocation. [00:52:48] You all are familiar with that. [00:52:50] You can see right here where the existing sidewalk comes right [00:52:53] up to the curb. [00:52:55] The problem with this project that's taken us a while [00:52:58] is we're trying to get buy-in from the residents [00:53:01] because our right-of-way is very limited. [00:53:04] So this year, we are taking and hopefully [00:53:08] going to be able to acquire the additional right-of-way that we [00:53:12] need or sidewalk easement from the residents [00:53:16] so that we can relocate that sidewalk, hopefully, [00:53:20] five feet back from its existing location. [00:53:24] There could be some areas where it would remain where it's at [00:53:29] simply because, as we've been doing some homework, [00:53:32] we have found out that there are some homes that [00:53:35] are closer to the roadway than what we thought. [00:53:38] So being able to move a sidewalk right up to a house [00:53:41] isn't a very good idea. [00:53:43] But the point is we're going to try [00:53:44] to get this sidewalk up back past that curb [00:53:48] because it's heavily utilized by the golf middle school kids. [00:53:53] And we have had some accidents there. [00:53:54] Is this stretch of Madison a candidate for a diet? [00:54:00] It could be. [00:54:01] So that would get you a little bit of extra room [00:54:04] for that sidewalk improvement, right? [00:54:11] Next project that we have is the 22 Street Improvement Project. [00:54:17] This area that's identified, we're [00:54:19] at the point now where we are trying [00:54:21] to rank the road conditions in groups by the neighborhoods [00:54:29] instead of individually going by each road. [00:54:33] This area is East Grand and the West Grand. [00:54:36] And there is a section of North River neighborhoods [00:54:40] that we'll be focusing on. [00:54:43] And of course, this would be the continuation. [00:54:46] This would be the design portion for the following year. [00:54:50] We would still be in the East and West Grand neighborhoods. [00:54:55] As you're doing those, I would encourage [00:55:00] you to look at any of those streets [00:55:02] that you're going to touch for redoing. [00:55:06] Look at the width and see if we can't just [00:55:08] go ahead and put them on a diet while you're doing it. [00:55:11] That'll save money on asphalt. [00:55:14] And it will slow the traffic down. [00:55:21] And it'll also make room available [00:55:22] if we don't have sidewalks on that particular stretch. [00:55:25] And I know in a bunch of these, and you [00:55:27] were talking about the West Grand having [00:55:30] to put sidewalks in, if you're going [00:55:32] to do street improvements on some of those same streets, [00:55:37] looking at it as holistically, I think, [00:55:42] would be beneficial. [00:55:44] Because that'll make it easier to figure out [00:55:46] where you can put sidewalks. [00:55:52] West Grand area of sidewalks, 14,000 feet, [00:55:59] that's getting close to three miles. [00:56:04] And that's going to make a huge difference [00:56:06] in that neighborhood. [00:56:08] And that's one of the hearts of our city, [00:56:13] our residential portion of our city. [00:56:16] And I think it's going to be really [00:56:21] going to make that whole neighborhood look different [00:56:24] and feel more like a neighborhood. [00:56:27] You know, if you do that, and it's an excellent point, [00:56:30] you narrow those streets down to make [00:56:32] them more residential speeds. [00:56:35] If you put the sidewalks into there, [00:56:40] that makes walking and the kids bicycling and doing [00:56:43] all that stuff a little better. [00:56:47] You're going to see houses in there [00:56:50] become very popular for people that [00:56:53] are looking to move into Newport Ridge. [00:56:55] Because that will just, like you say, [00:56:57] it'll change the whole way that neighborhood is viewed. [00:57:03] You look at some of the newer, well-planned neighborhood [00:57:08] developments and the combination of sidewalks and trees [00:57:15] along those areas, it really makes [00:57:18] a considerably different feel. [00:57:21] And very popular, particularly for younger families. [00:57:25] I think the folks in the West Grand neighborhood [00:57:27] are going to be really excited when [00:57:28] they see what's possible there. [00:57:33] All right, so these projects are housed in our Street Improvement [00:57:37] Fund, which is annually funded by the local option gas [00:57:42] tax and our paving assessment. [00:57:46] In addition to that, for next fiscal year, [00:57:49] we're proposing, or our staff have secured a CDBG grant [00:57:53] and other grants to fund the remaining [00:57:56] portion of the projects. [00:57:58] Without any other, if you have any other questions, if not, [00:58:01] then that concludes the summary and overview [00:58:05] of the capital improvement program. [00:58:08] H, you have any other thoughts? [00:58:14] Yes, sir, can you hear me? [00:58:16] We can now. [00:58:21] OK. [00:58:22] OK, yeah, I had recommended, and this just [00:58:26] ties into your last conversations about the look [00:58:28] and feel of the streets, not only for, [00:58:32] as you and Councilman Peters have alluded [00:58:35] to, the ambiance of the streets, but also the safety. [00:58:41] And I had recommended that we get [00:58:46] and I had recommended that we get some safety consulting. [00:58:56] And the word was planning that Mike brought up. [00:59:00] So while we have figures that we identify for engineering, [00:59:06] I'd like to clarify that those dollars could [00:59:08] be used in the planning and engineering, [00:59:13] because I intend to, I'd like to push [00:59:16] to see us look at the safety of our roads [00:59:17] again as we brought up last week. [00:59:20] And I think that can lead to the arguments [00:59:24] you're making on road diets as well. [00:59:27] Pete, I would agree with you 100%. [00:59:32] We need to take these roads back so the people that [00:59:35] live there actually have streets that fit their neighborhood [00:59:41] and that are safer. [00:59:42] So anything we do on engineering should [00:59:46] be looking at it from a safety standpoint [00:59:48] as well, because we want these to be neighborhood streets, not [00:59:52] thoroughfares.
This text was generated automatically from the meeting video. It is not a verbatim or official record. For exact wording, consult the video or the city clerk.